Tyremax – Custom Steel Facility

Challenge

Deliver a large-scale industrial facility within tight project timeframes while maintaining structural precision and coordination across fabrication and installation.

Solution

Full in-house fabrication combined with coordinated on-site installation allowed for efficient sequencing, reduced reliance on external suppliers, and improved control over quality and delivery timelines.

Outcome

Delivered on programme, the facility meets all engineering and performance requirements, providing a durable, fit-for-purpose structure built for long-term use.

Location:

Black Hill, NSW

Size:

10,000m²

Scope:

Design, Fabricate, Deliver, Install

Hunter Buildings delivered a 10,000m² custom steel facility designed to meet project-specific engineering requirements. The project was supported by our in-house fabrication capability, ensuring structural accuracy, controlled production, and alignment with programme requirements.